spolupráce

Your Project with Toka

Have a look at how working with Toka on your project will go forward. Our team of project managers and interior designers will guide you through the entire process from the initial idea through implementation to handing over the finished job.

Pokračovat

01

Capacity plan

Final agreement on cooperation and examination of premises for your project
02

Space plan

We then create a layout according to your operational needs.
03

Design

The design of the interior, including furnishings, materials, colors and styles is made.
04

Project documentation

We then prepare a detailed implementation plan of the project.
05

Implementation

Interior construction from large demolition works to small interior finishing works
06

Project Management and Supervision

Complete supervision of the building and interior furnishings, ensuring that the results match the original plans.

Fit-out

Capacity
Plan

We make a careful initial examination of the planned premises with you and make sure they truly suit your needs. A shared analysis of your present and future requirements optimizes that furnishing and use of space, saving you time and money.. The output of this part is the basis for the selection of the object and the scope of the leasable area.

Fit-out

Space
Plan

A well-designed use of space reflects a user-friendly environment that will not obstruct people while going about their day. We create a layout according to the client’s operational requirements with the exact determination of the size and orientation of individual spaces. Partitioning, zoning and the placement of furniture and other interior elements that reflect how people move about are all measured and put down on paper, giving the client a clear idea of how the office is to work. This is provided in the form of a 2D spatial plan with precise measurements and dimensions.

Fit-out

Design

Design is a comprehensive proposal including the selection of typical and atypical furniture, lighting, floor coverings, suspended ceilings, wall colors and the overall coordination of all materials and colors. Even the design of accessories, graphics and greenery are included. As part of the design, we align the functional elements and their quality to the financial possibilities of the client. Spatial visualizations provide a clear idea of what the future space will look like and help ensure that the client’s expectations will be fulfilled. The result of this step is a study of the interior, which serves as the working document for the project.

Fit-out

Project documentation

All project files are prepared for approval from the civic authorities in accordance with relevant municipal legislation. This results in the issuance of any required building permits and production of an itemized list of specifications.

Fit-out

Realization

The implementation of the construction in its entirety will ensure that the implementation of the works will follow each other smoothly. Projects from shell & core level. The work starts with the rough construction of a new building or demolition work in an existing building. The construction work includes SDK partitions, suspended ceilings, sanitary facilities, painting, double floors, cast floors, interior trowels and more.

Hyundai

Project Management and Supervision

Complete supervision of the building and interior furnishings, ensuring that the results match the original plans.

During the implementation stage, we routinely insect the construction site with the design plan at hand, cross-referencing both to ensure the construction process corresponds to the design, and resolve any changes.

At the same time, we monitor compliance with the work schedule. It goes without saying that regular communication with the client and the resolution of any client needs is done as a matter of course.

kontrolni
Regular on-site inspections
změny
Efficient management of ad hoc situations
harmonogram
Tight monitoring of work schedules
dohled
Thorough supervision ensuring the finished job matches the design plan